| | |
| | |
Stat |
Members: 3643 Articles: 2'487'895 Articles rated: 2609
28 March 2024 |
|
| | | |
|
Article overview
| |
|
Status of the warm front end of PXIE | A. Shemyakin
; M. Alvarez
; R. Andrews
; C. Baffes
; A. Chen
; B. Hanna
; L. Prost
; G. Saewert
; V. Scarpine
; J. Steimel
; D. Sun
; D. Li
; R. D'Arcy
; | Date: |
5 Feb 2015 | Abstract: | A CW-compatible, pulsed H- superconducting linac is envisaged as a possible
path for upgrading Fermilab’s injection complex. To validate the concept of the
front- end of such a machine, a test accelerator (a.k.a. PXIE) is under
construction. The warm part of this accelerator comprises a 10 mA DC, 30 keV H-
ion source, a 2m-long LEBT, a 2.1 MeV CW RFQ, and a 10-m long MEBT that is
capable of creating a large variety of bunch structures. The paper will report
commissioning results of a partially assembled LEBT, status of RFQ
manufacturing, and describe development of the MEBT, in particular, of elements
of its chopping system. | Source: | arXiv, 1502.1703 | Services: | Forum | Review | PDF | Favorites |
|
|
No review found.
Did you like this article?
Note: answers to reviews or questions about the article must be posted in the forum section.
Authors are not allowed to review their own article. They can use the forum section.
browser claudebot
|
| |
|
|
|
| News, job offers and information for researchers and scientists:
| |