Precedence-constrained scheduling problems parameterized by partial order width | René van Bevern
; Robert Bredereck
; Laurent Bulteau
; Christian Komusiewicz
; Nimrod Talmon
; Gerhard J. Woeginger
; | Date: |
3 May 2016 | Abstract: | Negatively answering a question posed by Mnich and Wiese (Math. Program.
154(1-2):533-562), we show that P2|prec,$p_j{in}{1,2}$|$C_{max}$, the
problem of finding a non-preemptive minimum-makespan schedule for
precedence-constrained jobs of lengths 1 and 2 on two parallel identical
machines, is W[2]-hard parameterized by the width of the partial order giving
the precedence constraints. To this end, we show that Shuffle Product, the
problem of deciding whether a given word can be obtained by interleaving the
letters of $k$ other given words, is W[2]-hard parameterized by $k$, thus
additionally answering a question posed by Rizzi and Vialette (CSR 2013).
Finally, refining a geometric algorithm due to Servakh (Diskretn. Anal. Issled.
Oper. 7(1):75-82), we show that the more general Resource-Constrained Project
Scheduling problem is fixed-parameter tractable parameterized by the partial
order width combined with the maximum allowed difference between the earliest
possible and factual starting time of a job. | Source: | arXiv, 1605.0901 | Services: | Forum | Review | PDF | Favorites |
|
|
No review found.
Did you like this article?
Note: answers to reviews or questions about the article must be posted in the forum section.
Authors are not allowed to review their own article. They can use the forum section.
browser Mozilla/5.0 AppleWebKit/537.36 (KHTML, like Gecko; compatible; ClaudeBot/1.0; +claudebot@anthropic.com)
|
| |
|
|
|
| News, job offers and information for researchers and scientists:
| |